News from the IOB

The IOB at the HyInHeat General Assembly in Grenoble

From 28 to 30 Janu­ary, our col­le­agues Chris­ti­an Wup­per­mann, Tho­mas Ech­ter­hof, Nico Schmitz, Felix Kai­ser, And­res Rami­rez San­chez, Elsa Bus­son, Alex Gar­cia-Ver­ga­ra and Johan­nes Losa­cker atten­ded the gene­ral assem­bly of the EU-fun­ded lar­ge-sca­le pro­ject HyIn­Heat — Hydro­gen Tech­no­lo­gies for Decar­bo­niza­ti­on of Indus­tri­al Hea­ting Pro­ces­ses in Gre­no­ble, France. The Gene­ral Assem­bly offe­red an inten­si­ve exch­an­ge of infor­ma­ti­on on the coope­ra­ti­on bet­ween the various pro­ject part­ners and inno­va­ti­ve ide­as for the project.

After arri­ving in Vor­ep­pe, our col­le­agues were given a tour of the C‑TEC deve­lo­p­ment cen­ter of alu­mi­num manu­fac­tu­rer Con­stel­li­um. It was par­ti­cu­lar­ly inte­res­t­ing to see the demons­tra­tor of the 12-ton­ne alu­mi­ni­um rever­bera­to­ry fur­nace in action for the first time. By com­bus­ting hydro­gen with pure oxy­gen, the mel­ting fur­nace enables CO2-neu­tral pro­duc­tion on an indus­tri­al sca­le. To this end, it was equip­ped with new bur­ners and exhaust gas mea­su­re­ment tech­no­lo­gy as part of the pro­ject. After­wards, IOB and Con­stel­li­um had the oppor­tu­ni­ty to dis­cuss future col­la­bo­ra­ti­on. A joint din­ner roun­ded off the first day.

The next day began with a mee­ting at the World Trade Cen­ter Gre­no­ble. After a brief intro­duc­tion by the hosts, the exch­an­ge on the work packa­ges began, with pro­ject pro­gress being pre­sen­ted and dis­cus­sed. After a lunch break, the atten­de­es had the oppor­tu­ni­ty to take part in a gui­ded tour of the C‑TEC deve­lo­p­ment cen­ter. In addi­ti­on to the modi­fied mel­ting fur­nace, insights were given into the deve­lo­p­ment exper­ti­se from recy­cling to the finis­hed pro­duct. The infor­ma­ti­ve day ended in a roof­top bar in Gre­no­ble. The­re, the dis­cus­sions con­tin­ued in a group setting.

On the second day of the Gene­ral Assem­bly, the mor­ning was again used to dis­cuss the various work packa­ges. Among other things, the design of a safe and effi­ci­ent H2 and O2 infra­struc­tu­re was dis­cus­sed. Over­all, the pro­ject part­ners were able to exch­an­ge infor­ma­ti­on on the sta­tus and initi­al results, as well as pro­blems and solu­ti­on stra­te­gies. A pos­ter ses­si­on began in the after­noon, in which pos­ters were pre­pared on indi­vi­du­al sub-tasks of the work packa­ges. Our col­le­agues con­tri­bu­ted to the ses­si­on with the fol­lo­wing topics:

  • Impact of H2 impu­ri­ties on flow measurement
  • Radia­ti­on Mode­ling in CFD: Dis­crete Ordi­na­tes and Weigh­ted Sum of Gray Gases
  • CFD Simu­la­ti­ons for Inte­gra­ti­on of an LTOF Bur­ner in Spei­ra’s 1‑ton Mel­ting Furnace.

In the remai­ning hours, important orga­niza­tio­nal points con­cer­ning the com­mu­ni­ca­ti­on and orga­niza­ti­on of the pro­ject were discussed.

We would like to thank Con­stel­li­um for their hos­pi­ta­li­ty and for the inte­res­t­ing tour of the deve­lo­p­ment cen­ter. We would also like to thank the Poli­tec­ni­co di Mila­no for sup­port­ing the event.

We look for­ward to the next Gene­ral Assembly!

Fur­ther infor­ma­ti­on about HyInHeat: